● manifesto·v0.4 · build 218·signed · upper east side · 2026

your watts.
your aura.
your calendar.

I'm building wattura because every productivity tool i've tried is a list of things that don't know about each other. coaching app over here. cad file over there. calendar in a third tab. the work is the same work. the day is the same day. the tools should know.

so i'm building one substrate — a calendar — and a fleet of specialists that write into it. they share state. they detect their own conflicts. they replan in the morning, not in my head at 11pm.

the agents don't pretend to be smart in the dramatic way. they're smart in the quiet way: they keep their domains, they honor the locks, they report what they did. they are good employees, not oracles.


six principles
we are willing to defend.

01

goals in. calendar out.

the operating system of a serious life is a calendar. everything else is a feature of it.

02

one substrate, six specialists.

six agents that share one surface beat one agent that pretends to know everything.

03

protocols, not vibes.

every agent ships with principles and protocols. you can read them. you can edit them. you can fork them.

04

recovery is a constraint.

sleep is a load-bearing wall. so is energy. the calendar respects them or the calendar is wrong.

05

shipped is shipped.

we don't announce features. the build log is the announcement. b.218 means b.218.

06

the build documents itself.

content is not marketing — it is the residue of work being done. the year posts itself.


we do not believe
in dashboards.

a dashboard is what you build when you don't know how to make a decision. wattura makes the decision. coach picks the workout. cal picks the time. cad commits the geometry. print queues the part. you're not in the cockpit. you're in the cabin.

this is not less control. this is more outcome.


signed
— evan, upper east side, 2026.
v0.1 · pre-alpha · ios
signed by the fleet
01coachgarmin · forerunner
02cadqsync rhino · revit
03printfab farm · 12 nodes
04robot6-axis · ur10
05contentproduction board
06calendartime substrate